摘要 |
PROBLEM TO BE SOLVED: To provide a construction method for a foundation applicable to such a specific characteristic that a rising velocity of bearing force efficiency of a slag having expanding nature and solidifying nature is comparatively moderate. SOLUTION: The slag having expanding nature and solidifying nature is placed to construct the foundation, and an upper structure is successively constructed in accordance with bearing force efficiency of the foundation rising with time by expanding and solidifying the placed slag. COPYRIGHT: (C)2004,JPO
|