PROBLEM TO BE SOLVED: To provide a pre-piping construction method, achieving reduction of the term of work and preventing workers of equipment work from temporarily concentrating on one portion to lower work efficiency in the case of constructing a structure by building work and equipment work, and effective especially in the case of causing delay in skeleton work such as steel frame erection. SOLUTION: In a construction method for a structure, including a process of building work such as steel frame erection, slab deck lying and concrete placing and a process of equipment work such as piping work, the piping work is performed concurrently in the process of the steel frame erection. COPYRIGHT: (C)2004,JPO
|