发明名称 WORK-EXECUTION METHOD FOR PILE
摘要 PROBLEM TO BE SOLVED: To provide a work-execution method for a pile capable of being beforehand installed even in a factory irrespective of construction at site and having a simple structure and easy building up. SOLUTION: A plurality of relatively small diametral fabrication piles 10 are laid in parallel and bounded integrally through a connection tool 11 to form a pile 100. COPYRIGHT: (C)2004,JPO
申请公布号 JP2004162348(A) 申请公布日期 2004.06.10
申请号 JP20020328731 申请日期 2002.11.12
申请人 GEOTOP CORP 发明人 KOJIMA EIJI
分类号 E02D5/30;(IPC1-7):E02D5/30 主分类号 E02D5/30
代理机构 代理人
主权项
地址