摘要 |
PROBLEM TO BE SOLVED: To provide a floor stone construction method, for accomplishing construction easily and in a short time without skill of professionals, and replacing, knocking and reusing the stone at little cost. SOLUTION: A raised edge 7 is formed along the four corner receiving parts 5 of a frame body 1 of a height adjust tool 10, the backside 24 of the stone 23 is placed on the receiving parts 5, a height adjust sheet 25 is formed to be equal to the height of the raised edge 7, non-landing adjustment is performed to dish up the stone 23 in which a sheet 27 is stuck to an edge stone 23A, the level/base of which is fixed using a work bench 11 on a sheet material 11 on the existing bed material 19, and a support function adhesive 33 is completely compressed to closely hold the stone 23. COPYRIGHT: (C)2004,JPO
|