发明名称 |
Method of completing a well in an unconsolidated formation |
摘要 |
Herein is described a method of completing an interval of a cased well drilled through incompetent formation. This method includes a combination of three successive operations: zero-degree phasing perforation of a relatively small portion of the interval to be completed, consolidation of the formation zone around the perforations and injection of a propped fracturing fluid above fracture pressure to create a gap between the cement and the borehole and pack this gap with a proppant held by a proppant flowback-retention agent.
|
申请公布号 |
US6732800(B2) |
申请公布日期 |
2004.05.11 |
申请号 |
US20020167880 |
申请日期 |
2002.06.12 |
申请人 |
SCHLUMBERGER TECHNOLOGY CORPORATION |
发明人 |
ACOCK ANDREW;HOOVER STEVE |
分类号 |
C09K8/575;C09K8/62;C09K8/80;E21B43/11;E21B43/26;(IPC1-7):E21B43/26 |
主分类号 |
C09K8/575 |
代理机构 |
|
代理人 |
|
主权项 |
|
地址 |
|