发明名称 SHAFT FOR PIPE-JACKING CONSTRUCTION WORK
摘要 PROBLEM TO BE SOLVED: To provide a shaft for a pipe-jacking construction work in which an earth retaining wall constituting the shaft has starting and arrival pit mouths and which has the earth retaining wall (an earth retaining panel) that also serves as a bearing wall for receiving propulsive reaction and has a displacement means for effectively utilizing passive earth pressure. SOLUTION: In the shaft A for the pipe-jacking construction work in which the square-shaped earth retaining panels are built on a square cylindrical frame-shaped lower earth retaining-panel unit B assembled by a sliding fitting means and the upper earth retaining panels C in a mode similarly assembled in a square cylindrical frame shape are built in a square cylindrical shape under a state that the panels C are connected successively in the building direction, bearing panels 1 having the displacement means in the propulsive line G direction are arranged on the lower earth retaining panel unit B, and pit-mouth plates 3 drilled by a pipe-jacking machine M left in soil in the case of pull-out removal are installed to the bearing panels 1. COPYRIGHT: (C)2004,JPO
申请公布号 JP2004124584(A) 申请公布日期 2004.04.22
申请号 JP20020292248 申请日期 2002.10.04
申请人 MORIMOTOGUMI:KK 发明人 AOKI KENICHI
分类号 E21D5/00;E21D1/08;(IPC1-7):E21D5/00 主分类号 E21D5/00
代理机构 代理人
主权项
地址