发明名称 CONSTRUCTION METHOD FOR BURYING PIPE
摘要 <p><P>PROBLEM TO BE SOLVED: To reduce the amount of earth and sand to be excavated and to greatly reduce execution time when burying a pipe into the ground by an open-cut method, and further to surely prevent the subsidence of the ground surface after backfill. <P>SOLUTION: After an excavation groove 2 for burying the pipe 1 is excavated by an extremely small width having a margin of a maximum of 10cm to the left and right to a diameter D of the pipe 1 to be buried and then the pipe 1 is arranged in the excavation groove 2, slurry-like fluidized soil 5, where water, earth and sand, and a setting agent are mixed at a position without exceeding the 1/2 of the diameter of the pipe 1, thus immediately throwing the earth and sand 6 to the upper portion of the fluidized soil for rolling. <P>COPYRIGHT: (C)2004,JPO</p>
申请公布号 JP2004125100(A) 申请公布日期 2004.04.22
申请号 JP20020291746 申请日期 2002.10.04
申请人 JFE KOKEN CORP 发明人 MATSUO ATSUSHI;ASANO TETSUJI
分类号 E02B9/06;E02F5/10;F16L1/024;F16L1/038;(IPC1-7):F16L1/024 主分类号 E02B9/06
代理机构 代理人
主权项
地址
您可能感兴趣的专利