发明名称 ROV installed suction piles
摘要 A method is disclosed for deploying a suction pile anchor in which flood valves are opened on the top of a suction pile and the suction pile anchor is off loaded from the anchor boat and lowered it to the sea floor. The suction pile anchor is set down and the rate of feed is adjusted to match the rate of self-penetration. An ROV with pump capability closes the flood valves on the top of the suction pile and attaches to the pumping port of the suction pile. The pump of the ROV operates to draw down the suction pile to full depth and brings the first load line connection and the attached first end of the load line well below the mudline while the second load connection at the second end of the load line is supported above the mudline. The ROV disconnects from the pump port and connects a mooring line to second the load connection. Another aspect of the present invention is a suction pile system having a suction pile with an ROV compatible pressure port and a flood valve at the top. A load support system includes a first load connection on the side of the suction pile with a load line connected to the first load connection. A second, ROV accessible load connection is provided at the distal end of the load line.
申请公布号 US6719496(B1) 申请公布日期 2004.04.13
申请号 US19980183100 申请日期 1998.11.02
申请人 SHELL OIL COMPANY 发明人 VON EBERSTEIN WILLIAM HENRY
分类号 B63B21/22;B63B21/27;(IPC1-7):B63B21/27 主分类号 B63B21/22
代理机构 代理人
主权项
地址