发明名称 |
CONSTRUCTION METHOD FOR LANDFILL |
摘要 |
PURPOSE: A construction method for a landfill is provided to prevent the waste of raw materials such as bentonite and zeolite, etc. and to reduce the construction expenses. CONSTITUTION: The construction method for a landfill comprises the steps of: executing a pit excavation for a landfill, and forming an underground water sewerage layer(110) containing rubbles(111) and a perforated pipe(112) on the upper part of the ground(100); forming a cutoff layer(120) on the underground water sewerage layer(110) using mixed water stopping materials which are formed by mixing 15¯20 weight percent bentonite(122) to the soil; and forming a protective earth layer on the cutoff layer(120).
|
申请公布号 |
KR20040029585(A) |
申请公布日期 |
2004.04.08 |
申请号 |
KR20020059891 |
申请日期 |
2002.10.01 |
申请人 |
KOREA PARAMOUNT CO., LTD. |
发明人 |
LEE, GANG WON;SHIN, SUN JU |
分类号 |
E02B3/18;E02D31/00;(IPC1-7):E02D31/00 |
主分类号 |
E02B3/18 |
代理机构 |
|
代理人 |
|
主权项 |
|
地址 |
|