摘要 |
<P>PROBLEM TO BE SOLVED: To individually and accurately an actual result by a working unit in a site, and to reflect the actual results to determination for progress as the whole work. <P>SOLUTION: This system is provided with a hierarchical division information providing means for providing hierarchical division information divided hierarchically to bring a division in the lowest rank stratum into a division for expressing the working unit by dividing the whole construction work a broad concept, and by dividing the each division a narrow concept, a plan input means 2 for inputting the amount of materials, a manhour and a construction work period planned as to the each working unit, an actual work result input means 3 for inputting the amount of materials and the manhour fed in the working unit executed every day, a progress calculating means for calculating a progress rate as the working unit, the division of higher hierarchy thereof or the whole in contrast to the amount of materials and the manhour finished accumulatedly till the day, the amount of materials and the manhour planned with the number of days and the construction work period, and a transition curve preparing means for plotting the progress rates on an ordinate while plotting dates on an abscissa to prepare a transition curve for transition. <P>COPYRIGHT: (C)2004,JPO |