发明名称 |
STRUCTURE AND CONSTRUCTION METHOD FOR BRIDGE |
摘要 |
PROBLEM TO BE SOLVED: To provide a structure and construction method for a bridge that can construct a bridge of satisfactory quality in a period shorter than the conventional one. SOLUTION: The bridge comprises abutment units 1, pier units 2 and ribbed deck slab units 3 as members of precast concrete. The pier units 2 along a river are stressed with horizontal PC steel to constitute a multi-span rigid frame. The ribbed deck slab units 3 across the river are tensioned with PC steel to constitute a continuous beam. Both ends of the ribbed deck slab units 3 as the continuous beam and the abutment units 1 are tensioned with vertical PC steel to constitute a rigid frame structure. COPYRIGHT: (C)2004,JPO |
申请公布号 |
JP2004092078(A) |
申请公布日期 |
2004.03.25 |
申请号 |
JP20020251884 |
申请日期 |
2002.08.29 |
申请人 |
NIPPON PS:KK;SHIMIZU CORP |
发明人 |
SUZUKI YOSHIO;INAOKA SHUNSUKE;TERAGUCHI HIDEAKI;MARUI HIROSHI |
分类号 |
E01D1/00;E01D21/00;E01D101/24;(IPC1-7):E01D1/00 |
主分类号 |
E01D1/00 |
代理机构 |
|
代理人 |
|
主权项 |
|
地址 |
|