发明名称 STRUCTURE AND CONSTRUCTION METHOD FOR BRIDGE
摘要 PROBLEM TO BE SOLVED: To provide a structure and construction method for a bridge that can construct a bridge of satisfactory quality in a period shorter than the conventional one. SOLUTION: The bridge comprises abutment units 1, pier units 2 and ribbed deck slab units 3 as members of precast concrete. The pier units 2 along a river are stressed with horizontal PC steel to constitute a multi-span rigid frame. The ribbed deck slab units 3 across the river are tensioned with PC steel to constitute a continuous beam. Both ends of the ribbed deck slab units 3 as the continuous beam and the abutment units 1 are tensioned with vertical PC steel to constitute a rigid frame structure. COPYRIGHT: (C)2004,JPO
申请公布号 JP2004092078(A) 申请公布日期 2004.03.25
申请号 JP20020251884 申请日期 2002.08.29
申请人 NIPPON PS:KK;SHIMIZU CORP 发明人 SUZUKI YOSHIO;INAOKA SHUNSUKE;TERAGUCHI HIDEAKI;MARUI HIROSHI
分类号 E01D1/00;E01D21/00;E01D101/24;(IPC1-7):E01D1/00 主分类号 E01D1/00
代理机构 代理人
主权项
地址