发明名称 A SCHEDULING METHOD AND SYSTEM FOR CONTROLLING EXECUTION OF PROCESSES
摘要 <p>A workload scheduler detects a long-running job when its duration exceeds a threshold value calculated by applying a multiplication factor to an estimated duration of the job. An operator inputs two extreme values of the multiplication factor, which consist of an upper level for the short-duration jobs and a lower level for the long-duration jobs. An algorithm then calculates the appropriate multiplication factor for any particular job, giving much more weight to the upper level when the estimated duration is small, but which gradually swings the levels to give more importance to the lower level when the estimated duration is long.</p>
申请公布号 EP1399785(A2) 申请公布日期 2004.03.24
申请号 EP20020782433 申请日期 2002.03.21
申请人 INTERNATIONAL BUSINESS MACHINES CORPORATION 发明人 SCOT, MACLELLAN
分类号 G05B19/05;G05B19/418;G06F9/48;(IPC1-7):G05B19/042;G06F11/00;G06F11/34;G06F9/46 主分类号 G05B19/05
代理机构 代理人
主权项
地址