发明名称 |
Ordered product delivery date management system for management product or part production slot exchange |
摘要 |
When content of a production slot database indicates that there is no free production slot which can be allocated to an ordered vehicle designated in received order information, a production management section exchanges a production slot assigned to a potential vehicle so that the ordered vehicle can be delivered by the desired date. When no potential vehicle slot is available, a production slot for an ordered vehicle can be exchanged with that for another ordered vehicle for which a production slot has been secured, and the production slot date of the other vehicle is postponed to another day before the desired delivery date. When a production slot is secured before the desired delivery date but the production slot for a part required for producing the ordered vehicle cannot be secured, management of exchange is performed for the part according to a parts production slot database to enable delivery of as many vehicles by the delivery dates desired by customers as possible.
|
申请公布号 |
US6711449(B1) |
申请公布日期 |
2004.03.23 |
申请号 |
US20000592844 |
申请日期 |
2000.06.13 |
申请人 |
TOYOTA JIDOSHA KABUSHIKI KAISHA |
发明人 |
MIYAHARA SHUNJI;ISHIZAKI AKIRA |
分类号 |
B23Q41/08;B65G61/00;G05B19/418;G06Q10/08;G06Q50/00;G06Q50/04;G06Q50/28;(IPC1-7):G06F19/00 |
主分类号 |
B23Q41/08 |
代理机构 |
|
代理人 |
|
主权项 |
|
地址 |
|