发明名称 PROCESS OF RECONSTRUCTION OF BEAM BRIDGE
摘要 FIELD: bridge construction and repair. SUBSTANCE: invention can find use in repair and reconstruction of steel and steel-reinforced concrete bridges with one, two or more superstructures with water flow rate less than 100 cu m/s and viaducts. Process of reconstruction of beam bridge that has at least one superstructure includes dismounting of all superstructures, replacement of one superstructure with ground-filled structure. Novelty of approach lies in that ground-filled structure is mounted on existing pile trestles of superstructure with their subsequent joining. Existing trestles are shortened in points of ground-filled structure resting on them prior to mounting. Non-engaged trestles of superstructure are shortened when there is necessity to conduct mounting or ground filling operations for rebuilding of pavement of bridge and road. In this case frame-and-arched structure is utilized as ground-filled structure. EFFECT: development of more economic process of reconstruction of beam bridge with use of existing pile-trestle base. 2 cl, 2 dwg
申请公布号 RU2225912(C1) 申请公布日期 2004.03.20
申请号 RU20030108478 申请日期 2003.03.26
申请人 发明人 VYLEGZHANIN A.A.;BOL' A.A.;SHESTAKOV V.A.
分类号 E01D24/00;E01D22/00 主分类号 E01D24/00
代理机构 代理人
主权项
地址