发明名称 SOIL-IMPROVEMENT METHOD AND SOIL-IMPROVEMENT DEVICE IN TUNNEL CONSTRUCTION WORK
摘要 PROBLEM TO BE SOLVED: To provide a soil-improvement method and a soil-improvement device in tunnel construction works, which can be adopted regardless of the type of the cutter structure of a tunnel boring machine and in which chemicals can be injected properly even on the inside of a curve in the case of the construction of a sharp curve and a wide working space can be ensured. SOLUTION: An injection pipe 50 is extended up to the tunnel boring machine 1 side obliquely forwards from an existing segment 14a placed at the rear of the tunnel boring machine 1, and a soil-improvement agent (chemicals) is injected from the injection pipe 50. Accordingly, chemicals are injected regardless of the cutter structure of the boring machine 1 completely. Since an angle of inclinationθto a tunnel center line of the pipe 50 is increased easily, chemicals can be injected properly even inside a curve by increasing the angle in the rectangular direction in the case of the construction of the sharp curve. Since a section where the segment 14a is positioned is separated from the boring machine 1, the wide working space can be ensured. COPYRIGHT: (C)2004,JPO
申请公布号 JP2004076388(A) 申请公布日期 2004.03.11
申请号 JP20020237959 申请日期 2002.08.19
申请人 ISHIKAWAJIMA HARIMA HEAVY IND CO LTD;SHIMIZU CORP 发明人 YOSHIDA YUZURU;SAKUMA YUJI;SHIRAHAMA KAZUTO
分类号 E02D3/12;E21D9/06;(IPC1-7):E21D9/06 主分类号 E02D3/12
代理机构 代理人
主权项
地址