发明名称 CONSTRUCTION METHOD OF BRIDGE
摘要 PROBLEM TO BE SOLVED: To reduce the expenditure of a maintenance business including a construction cost of work itself by minimizing social and economic loss when constructing a bridge. SOLUTION: An upper work installed on a bridge pier is formed as a width expandable structure, and a width is expanded after installing the upper work on the bridge pier in a width narrowed state. COPYRIGHT: (C)2004,JPO
申请公布号 JP2004068551(A) 申请公布日期 2004.03.04
申请号 JP20020233292 申请日期 2002.08.09
申请人 MITSUBISHI HEAVY IND LTD 发明人 ONAMI SHUJI;KURIHARA MASAYUKI
分类号 E01C1/04;E01D2/02;E01D21/00;(IPC1-7):E01C1/04 主分类号 E01C1/04
代理机构 代理人
主权项
地址