摘要 |
<P>PROBLEM TO BE SOLVED: To accurately manage setting of the operation guarantee period of a secondhand product and the time to replace consumables used with the secondhand product. <P>SOLUTION: A consumable management system is so formed that information indicating the amount that consumables are used with an image processor 152 is accumulated in a centralized management database system 100 from the image processor 152 through a communication line 156. When the use of the image processor 152 is complete and it is to be recycled and sold as a secondhand product, the degree to which the consumbales were used is calculated on the basis of the accumulated information indicating the amount that the consumables were used. Further, based on the degree to which the consumables were used, the setting of the guarantee period of the secondhand product and the time to replace the consumables are managed. <P>COPYRIGHT: (C)2004,JPO |