<p><P>PROBLEM TO BE SOLVED: To surely deliver a material specified in a house design to a construction site according to a request of construction schedule, and to eliminate a mismatch between the material delivered to the construction site and the specified material in various terms such as a part number mismatch, a size mismatch and a construction schedule mismatch, thereby preventing troubles on the site and delay in the construction schedule. <P>SOLUTION: In the housing material order delivery management method, material information based on an order data is written in an IC tag of a material, and the material information is read from the IC tag of the material on the construction site or in the process of distribution to the construction site to check or verify the material. <P>COPYRIGHT: (C)2004,JPO</p> |