摘要 |
PROBLEM TO BE SOLVED: To provide a slope block unit that can reduce working processes and working man-hours in slope construction work and easily cope with the inclination angle difference of a slope. SOLUTION: This slope block unit is provided with a foundation block 2 laid at a boundary part between a road 7 and the slope 8, and a rectangular slope block 3 laid along the slope 8. A slope side inclined part 2a is formed at one shoulder part of the foundation block 2, and the slope side inclined part 2a and the lower end part of the slope block 3 are connected through an angle adjustable joint 4. COPYRIGHT: (C)2004,JPO
|