摘要 |
PROBLEM TO BE SOLVED: To reduce costs by simplifying structure, and save a space. SOLUTION: A guide rail installation member 3 having slits 3c extended in parallel to a length direction of the guide rail 5 is fixed to a base 2. A tie plate 4 is welded to be fixed to a second surface 3b of the guide rail installation member 3. Bolts 6 are inserted into rail holes and the slits 3c, and the bolts 6 are further engaged with screw holes in the tie plate 4. Load on the guide rail 5 is thus transmitted through the tie plate 4 and the guide rail installation member 3 to the base 2. COPYRIGHT: (C)2004,JPO
|