摘要 |
PROBLEM TO BE SOLVED: To provide a floor structure of a sanitary equipment unit for eliminating sealing work by silicone, improving workability of installation, and maintaining the sure water cut-off function and cleanliness in a connecting part over a long period. SOLUTION: This floor structure of the sanitary equipment unit forms a floor by connecting at least two floor pans, and is characterized by integrally forming a projection strip having the prescribed height projecting in the vertical direction on one floor pan, and integrally forming an engaging part for engaging with the projection strip on the other floor pan when connecting both pans in the connecting part of the respective floor pans. In the connecting part, one floor pan is positioned in a lower part, and the projection strip projects upward, and the other floor pan is positioned in an upper part, and the engaging part is placed on and engaged with the projection strip from above. COPYRIGHT: (C)2004,JPO
|