摘要 |
FIELD: construction industry, particularly building construction of cast-in-place reinforced concrete with the use of sliding form. SUBSTANCE: method involves installing intermediate form panels having lifting eyes into gap between base form panels and hardening concrete layer, arranging gap into design position and releasing partition panel having lifting eyes connected thereto by spacers, securing lifting eyes into position in which intermediate form panels are snug against sliding form panels; placing lower partition panel edge between compacted concrete layers of different composition along contact line thereof on the depth of 1-2 sm; filling cavities between intermediate panels with concrete mixture to form base structural layer and concrete mixture to form heating layer of macro-porous concrete; removing spacers and partition panel just after concrete layers consolidation; precipitating concrete mixture up to concrete mixture adjoining to construction layer concrete which results in filling of the gap created after partition panel removal; consecutively removing intermediate panels, locating intermediate panels in new position, repeating the above operations. EFFECT: possibility of multi-layered wall construction of several concrete layers having different structural and heat properties. 6 dwg |