发明名称 LOAD LIMITING METHOD FOR STEAM TURBINE
摘要 PROBLEM TO BE SOLVED: To rapidly secure the quantity of steam supply to a condensing steam turbine to which a high pressure steam essential load facility is connected, when steam generating flow in a steam generating facility 1 is reduced. SOLUTION: A difference valueδbetween the steam flow generated in the steam generating facility 1, and the quantity of steam supplied to the back pressure steam turbine 6 side, is detected, and the difference between the difference valueδand a target valueδ* is successively detected as a target restriction steam quantity▵F. When the steam generating facility 1 trips, a target value F* of the steam supply quantity to the back pressure steam turbine 6 side when reducing the present steam quantity supplied to the back pressure steam turbine 6 side, by the target restriction steam quantity▵F, is computed, and valve opening V* of a governing valve 12 that can realize the target value F* is detected from the target value F* and a predetermined characteristic chart. The valve opening of the governing valve 12 is then adjusted to become the valve opening V*. COPYRIGHT: (C)2004,JPO
申请公布号 JP2004052695(A) 申请公布日期 2004.02.19
申请号 JP20020212892 申请日期 2002.07.22
申请人 JFE STEEL KK 发明人 ONO TOSHIHIKO
分类号 F01D17/00;F01D21/00;F01K13/02;(IPC1-7):F01D17/00 主分类号 F01D17/00
代理机构 代理人
主权项
地址