摘要 |
<P>PROBLEM TO BE SOLVED: To provide a load test system in which a state of a loaded test terminal or a load tested process subject to a load test by a test manager terminal instructing the load test is monitored, and a function for remotely rebooting the loaded test terminal or restarting the load tested process when the test is hardly continued due to a high-load access. <P>SOLUTION: The system is provided with a server monitoring means for monitoring the state of the loaded test terminal and a tested server and acquiring a used resource thereof during the load test, a display means for displaying, in real-time, information on the loaded test terminal acquired by the monitoring on the test manager terminal, and a terminal remote/reboot means for detecting a high-load state of the loaded test terminal from the server state acquired from the monitoring of the server and restoring back the state of the terminal. <P>COPYRIGHT: (C)2004,JPO |