PURPOSE: An arrangement method for the head of a concrete footing pile is provided to arrange the head of a concrete footing pile safely and easily, and to prevent the lowering of strength of a footing pile without cutting off a steel wire of a concrete footing pile. CONSTITUTION: The arrangement method for the head of a concrete footing pile comprises the steps of: cutting off the outer circumference of a concrete footing pile(10) in a radius direction from the preappointed height of each concrete footing pile while driving a concrete footing pile(10) into the ground; cutting off the inner circumference of a concrete footing pile(10) toward the outer circumference to correspond the outer circumference to the severed height; and exposing a steel wire(14) laid along the circumference of the concrete footing pile(10) by crushing the upper end of the concrete footing pile(10).
|