发明名称 CONCRETE RECEIVING BEAM AND METHOD FOR BUILDING GIRDER BY USING IT
摘要 PROBLEM TO BE SOLVED: To simplify the operation of the building, removal or the like of a scaffold and others, and to reduce cost although a receiving beam for a scaffold board or the like is constructed of cast-in-place concrete, many man-hours are required for a material transport means or the like and labor for the building, removal or the like of the scaffold and others is needed in conventional devices. SOLUTION: The concrete receiving beam 10 is divided in the longitudinal direction and precast-concrete blocks at every support are manufactured, and each divided precast-concrete block has a connecting hole with the support 101, has a U-shaped void 13 in a connecting section with the adjacent block and has a receiving-beam longitudinal PC steel-material inserting hole 21. COPYRIGHT: (C)2004,JPO
申请公布号 JP2003336213(A) 申请公布日期 2003.11.28
申请号 JP20020143104 申请日期 2002.05.17
申请人 PS MITSUBISHI CONSTRUCTION CO LTD;OHBAYASHI CORP 发明人 SUZUKI YOSHITERU;OKUYA YUSUKE;INA YOSHINAO
分类号 E01D1/00;E01D2/00;E01D21/00;E04B1/21;(IPC1-7):E01D1/00 主分类号 E01D1/00
代理机构 代理人
主权项
地址