摘要 |
<p><P>PROBLEM TO BE SOLVED: To contribute to work pace making while properly grasping an advance condition including the exchange of components, etc. <P>SOLUTION: An input device C1 inputs the machine tact of a cutting and pressing apparatus, the changeover work time of manual works, and an off-line set-up possible time. A computer main body C2 generates a schedule by incorporating the off-line set-up possible time to proceed by superimposition in parallel with the operating time of the cutting and pressing apparatus. The generated schedule is displayed in a display device C3, and reported to an operator on a job site. The display device C3 displays the advance condition of the actual work with respect to the schedule. Thus, the advance is strictly managed through the use of the objective schedule, so that work efficiency is raised by precise pace making. <P>COPYRIGHT: (C)2004,JPO</p> |