摘要 |
The connection and force take up device comprises a micro pile fitted at the top with a plate and a tube (12) introduced along the length of a hole and connecting grout interposed between the hole walls and the tube. The plate and post (30) are connected by screws/nuts (26). There are connections (32) between the plate and stringers (34) where the construction requires them. These connection comprise spigots (36) which project perpendicularly to the plate horizontal plane and engage reserves (38) in the ends of the stringers. Sealing mortar (40) is introduced into the reserves to immobilize the spigots. |