摘要 |
<P>PROBLEM TO BE SOLVED: To provide a schedule setting method for a facility and equipment management system that reduces repetition of the same work and to shorten the input work, and the facility and equipment managing system. <P>SOLUTION: A schedule setting routine 12 is a schedule setting method for setting an operation schedule for a plurality pieces of facility equipment 3 via an input screen, in this facility equipment management system for controlling the plurality piece of facility equipment 3, and is provided with the first step and the second step. The facility equipment 3 of a setting objective is selected in the first step. At least one out of input items of a time when an operation of the facility equipment 3 selected in the first step is executed, and a content of the facility equipment 3 selected in the first step is input in the second step. A time of the operation schedule or a content of the operation which is already set is displayed on a setting screen, as a default of the input item, in the second step in the schedule setting routine 12, when the already set operation schedule exists. <P>COPYRIGHT: (C)2004,JPO |