发明名称 Method for obtaining load-following and/or spectral shift capability in boiling water reactors.
摘要 <p>The present invention discloses an improved construction and methodology for achieving desirable recirculation flow control and/or sub-cooling control in a BWR enabling reactors utilizing the method to perform in load-following and/or spectral shift modes of power operations. In its broadest aspects, the method is based on the application of at least two feedwater spargers (16; 18 and/or 50) at different locations in the reactor to achieve load following capability by modifying core inlet sub-cooling or recirculation flow in the reactor. In one aspect the application of a second feedwater sparger modifies the driving head because the down-flow of core-generated steam not completely separated out of the recirculating coolant (termed "steam carryunder"), being quenched at different elevations, will result in a different recirculation flow rate, thus influencing the power level. The double sparger concept used to modify sub-cooling additionally will influence the void fraction and density of the water in the core, thus effecting the power level in the core.</p>
申请公布号 EP0405981(A2) 申请公布日期 1991.01.02
申请号 EP19900307092 申请日期 1990.06.28
申请人 GENERAL ELECTRIC COMPANY 发明人 OOSTERKAMP, WILLEM JAN
分类号 G21C7/27;G21C1/08;G21C7/32;G21C15/02;G21D3/12 主分类号 G21C7/27
代理机构 代理人
主权项
地址