发明名称 BUILD-TO-ORDER PRODUCTION PLANNING METHOD
摘要 <p><P>PROBLEM TO BE SOLVED: To set an operation period for leveling according to an order-receiving situation of products relating to build-to-order production, a supply situation of components, and inventory of products. <P>SOLUTION: When an average received-order quantity for every element of products continues by exceeding a predetermined number of times (predetermined shift numbers) in the vicinity of the maximum production quantity, since a portion to be moved backward because of exceeding the maximum production quantity in an operation period is increased when the operation period is set long, and it causes a delay of production, the operation period is corrected to be shortened to decrease the portion moved backward, so that a portion varied by received orders can be newly leveled in the next operation period. <P>COPYRIGHT: (C)2004,JPO</p>
申请公布号 JP2003280719(A) 申请公布日期 2003.10.02
申请号 JP20020077194 申请日期 2002.03.19
申请人 MAZDA MOTOR CORP 发明人 SHIBUKI HIROAKI;HARADA KOICHI;AWANE YOSHIKI;ISHII ATSUO;NAKAJIMA MASAKO
分类号 G05B19/418;G06Q50/00;G06Q50/04;(IPC1-7):G05B19/418;G06F17/60 主分类号 G05B19/418
代理机构 代理人
主权项
地址