发明名称 PRODUCTION PLANNING SUPPORT METHOD, ITS DEVICE AND PRODUCTION CONTROL SYSTEM
摘要 <p><P>PROBLEM TO BE SOLVED: To automatically set work processes and estimate manhours for all the processes even if there is manual work by dispensing with manual work process setting and manhour estimation. <P>SOLUTION: Component structure information and feature information are extracted from three-dimensional CAD data of components stored in a three- dimensional design CAD device 3 by a component work CAPP 1. In the component work CAPP 1, attribute data comprising assembly information, surface finish information, dimensional tolerance information and material information are added to the component structure information and the feature information. On the basis of the information, a feature line is expanded to a using tool line and the like based on a certain rule to set the work process and estimate manhours for each component. <P>COPYRIGHT: (C)2004,JPO</p>
申请公布号 JP2003280715(A) 申请公布日期 2003.10.02
申请号 JP20020077089 申请日期 2002.03.19
申请人 TOSHIBA CORP 发明人 TOMIZU HARUO
分类号 G05B19/418;G06Q50/00;G06Q50/04;(IPC1-7):G05B19/418;G06F17/60 主分类号 G05B19/418
代理机构 代理人
主权项
地址