摘要 |
A method for soil erosion control works capable of preventing the bed and bank of a gorge being eroded by a torrent by using steel ropes and steel nets not requiring enormous amounts of construction labor and expenses, comprising the steps of fixing at least two vertical cables (1) directly or indirectly to a base (2), fixing the plurality of vertical cables to each other by using at least two lateral cables (5) at proper intervals, and anchoring at least two nets (3) corresponding to the number of the lateral cables by using the vertical cables and the lateral cables or anchored cables connected to the vertical cables by generally opposing the nets to the water flow so that the nets are present in the torrent at proper intervals from the upstream to the downstream side. <IMAGE>
|