摘要 |
Method for hydro-insulation of existing walls includes arrangement of main holes across the walls, at distance one from another, with the vertical dimension larger than the horizontal one, with filling the main holes with curing water-impermeable material and after its curing one arranged connectingholes with the vertical dimension smaller than the horizontal one, with filling the connecting openings with curing water-impermeable material. Such implementation of the method makes it possible to provide hydro-insulation of existing wall in ready building of construction.
|