摘要 |
<P>PROBLEM TO BE SOLVED: To provide an adjusting device for power interruption during work capable of positively performing adjustment for work based on an actual change in equipment status. <P>SOLUTION: This adjusting device for power interruption during work performs scheduling using a scheduling mechanism 4 with a work plan management mechanism 3, based on a database consisting of an equipment database 5 indicating a detailed equipment status for a work plan associated with power interruption work identified for each job name. The detailed equipment status in the database consisting of the equipment database 5 is updated according to a forecast information of a future equipment status by adjustment for the work plan. <P>COPYRIGHT: (C)2003,JPO |