发明名称 WORK METHOD FOR MEASURES AGAINST LIQUEFACTION OF GROUND
摘要 PROBLEM TO BE SOLVED: To provide a work method for measures against the liquefaction of a ground capable of supporting a placed load by chuting and filling slag produced when steel is produced inside an outer peripheral wall surrounding the specified range of a sand ground where liquefaction is liable to occur to easily improve the ground over a wide range at a low cost. SOLUTION: The outer peripheral wall 1 is constructed under the ground by using concrete so as to surround the surroundings, the entire ground constructing an upper structure 4 is dug from a surface layer to a ground capable of supporting the upper structure, and slag 2 is chuted and filled inside the outer peripheral wall 1. Thus, the ground can be improved by utilizing the inflation and solidification of the slag 2 caused by water absorption. COPYRIGHT: (C)2003,JPO
申请公布号 JP2003253662(A) 申请公布日期 2003.09.10
申请号 JP20020058123 申请日期 2002.03.05
申请人 GEOTOP CORP 发明人 YABUUCHI SADAO
分类号 E02D3/00;(IPC1-7):E02D3/00 主分类号 E02D3/00
代理机构 代理人
主权项
地址