发明名称 METHOD OF SHUTOFF OF WATER INFLOW TO WELL
摘要 FIELD: oil and gas producing industry, particularly, methods of shutoff of water inflow to oil and gas wells before well casing. SUBSTANCE: method includes separation of interval of water- saturated bed, injection of isolating material to bottomhole and wellbore zone of water-saturated bed with use of hydraulic pressure jets before well casing. Injected to said zones is isolating material in form of gel-cement slurry with isolation of high-permeability zone of water-saturated bed under excessive pressure at sealed wellhead of 6.5 Mpa. Filtration surfaces of wellbore zone are isolated with help of hydraulic pressure jets of said slurry at speed of tool lifting of 0.4 m/s. After that, residues of gel-cement slurry are washed out to surface, and casing string is lowered into well and cemented. EFFECT: increased oil-gas recovery from formations and prolonged water-free oil production period by higher quality, efficiency and reliability of waterproofing operations. 1 ex
申请公布号 RU2211303(C2) 申请公布日期 2003.08.27
申请号 RU20010127379 申请日期 2001.10.08
申请人 POLJAKOV VLADIMIR NIKOLAEVICH 发明人 KHAMINOV N.I.;STAROV O.E.;SAGIDULLIN I.A.;ISHKAEV R.K.;KHUSAINOV V.M.;GUMAROV N.F.;POLJAKOV V.N.
分类号 E21B33/13;E21B21/14;E21B33/138 主分类号 E21B33/13
代理机构 代理人
主权项
地址