发明名称 Process of installing a precast concrete pile below a structure
摘要 A process for installing piles for supporting a structure upon the earth including the steps of driving a first pile segment into the earth a desired distance from the structure, aligning a second pile segment upon the first pile segment such that a conduit in the second pile segment is axially aligned with the conduit of the first pile segment, driving the first and second pile segments into the earth a desired distance from the structure, affixing a strand into the conduits of the first and second pile segments so as to form a starter section, and sliding another pile segment along the strand so as to reside upon the starter section. A plurality of pile segments are positioned along the strand so as to reside in stacked relationship upon the starter section. A cap member is positioned between a portion of the structure at an uppermost pile segment of the plurality of pile segments. An end of the strand is anchored in the cap member.
申请公布号 US6609856(B1) 申请公布日期 2003.08.26
申请号 US20000545144 申请日期 2000.04.07
申请人 KNIGHT DAVID W. 发明人 KNIGHT DAVID W.
分类号 E02D5/52;E02D27/48;(IPC1-7):E02D5/30 主分类号 E02D5/52
代理机构 代理人
主权项
地址