发明名称 Borehullsforgrening og fremgangsmåte for å opprette en borehullsforgrening
摘要 <p>New wellbore milling systems and methods of their use have been developed, the milling system in one aspect including at least one mill, at least one stabilizing member connected to and above the at least one mill, and the at least one stabilizing member for maintaining position of the at least one mill for milling through the liner into the main wellbore. In certain aspects multiple spaced-apart stabilizers are used above a mill which, in one aspect, may include one or more reaming stabilizers. In one aspect the lowermost stabilizer is spaced-apart from a mill so that the stabilizer does not enter a bend portion of a liner to be milled until milling has commenced.</p>
申请公布号 NO20033691(D0) 申请公布日期 2003.08.20
申请号 NO20030003691 申请日期 2003.08.20
申请人 WEATHERFORD/LAMB INC 发明人 HAUGEN, DAVID MICHAEL;JOHNSON, MONTE IRA;BAILEY, THOMAS FLOYD;CARTER, THURMAN BEAMER;KUCK, MARC DAVID;ROBERTSON, ROBERT EUGENE;SPIELMAN, WILLIAM ALAN;BLIZZARD, WILLIAM ALAN;BARRY, ANDREW ARTHUR WHITAKER;SINGLETON, TEME FORREST;MCCLUNG, GUY LAMONT;ROBERTS, JOHN DOUGLAS
分类号 E21B7/06;E21B7/08;E21B7/10;E21B10/04;E21B10/46;E21B10/50;E21B10/60;E21B12/04;E21B17/02;E21B21/10;E21B23/00;E21B23/01;E21B23/02;E21B23/04;E21B23/06;E21B29/06;E21B34/10;E21B41/00;E21B44/00;E21B47/09;E21B49/06;(IPC1-7):E21B 主分类号 E21B7/06
代理机构 代理人
主权项
地址