摘要 |
<p><P>PROBLEM TO BE SOLVED: To achieve miniaturization, operationality, and maintainability of a control panel by dividing one central control panel remotely operating arbitrary production facility with connecting a plurality of production facilities via a network into a control panel for the facility and a control panel for the adjustment to use both of them according to the intended use. <P>SOLUTION: In a control panel for the production facility to control a plurality of production facilities by connecting via a network, a control panel for the facility which is used mainly for operation preparation in time of production and for the operation of returning to a facility original position in the recovery operation from the facility emergency stop or the like and a portable control panel for adjustment, for example a personal computer, which mainly performs facility adjustment, is constituted of a sensor installation adjustment at maintenance, speed adjustment of various driving sources driving the facilities, the maintenance in time of the adjustment by the adjusting operator and maintenance. <P>COPYRIGHT: (C)2003,JPO</p> |