发明名称 Production planning system
摘要 The production of semiconductor devices manufactured through a plurality of manufacturing sites is unitarily managed and an appropriate production plan is instructed. A computer projects a production plan of an entire company from necessary information such as a planning and finishing volume and a day's schedule of each of the manufacturing sites, each item and each process for satisfying a demand estimation of a product, order information on the product, and a product volume required to be manufactured which information are collected from a customer computer and a production management computer and the like. The production plan is provided to each manufacturing site as a production instruction and provided to each business person or customer as a storing reply or an order accepting period reply. If the projected production plan (possible production volume) does not coincide with a production plan (necessary production volume), parameters obtained by correcting production allocation, production capability, lead time, yield and the like are re-input from a parameter input terminal. Based on the corrected parameters, the computer re-projects the production plan and projects an optimum production plan.
申请公布号 US2003149503(A1) 申请公布日期 2003.08.07
申请号 US20030357470 申请日期 2003.02.04
申请人 HITACHI, LTD. 发明人 KAWASE KIYOHISA;YUASA HAJIME;MAEDA KAZUHIKO;KOBAYASHI YOSHIO;MISHIMA OSAMU;HONMA TAKASHI;AKASHI JUN;YAMADA HIROSHI;MASUNAGA KENICHIRO;KOYAMA MASAHIRO;FUNAKI KENICHI
分类号 G05B19/418;G06Q50/00;G06Q50/04;H01L21/02;(IPC1-7):G06F19/00 主分类号 G05B19/418
代理机构 代理人
主权项
地址