摘要 |
<P>PROBLEM TO BE SOLVED: To provide a cost estimate supporting method for a designed-to-order product, a system therefor, a recording medium and a program capable of swiftly giving an accurate cost estimate by correcting a cost difference in experiential estimates caused by a personal attribute or experiential insufficiency. <P>SOLUTION: A computer 1 constructing the cost estimate supporting system is composed of an input device 2 comprising a pointing device such as a keyboard or a mouse, an output device 3 comprising a printer or a display, an arithmetic unit 4, a recorder 5 which is an outboard recorder such as a hard disk, and a drive unit provided as needed for the recording medium written with a program or data executed by the arithmetic unit 4 for constructing the system. The arithmetic unit 4 corrects the cost classified by specifications inputted by the input device 2 on the basis of a manufacturing cost corresponding to the cost classified by specifications of a cost estimator of history data recorded in the recorder 5. <P>COPYRIGHT: (C)2003,JPO |