摘要 |
<P>PROBLEM TO BE SOLVED: To solve the problem that a higher manager should early detect a project considered to exceed an estimated cost/period from a number of projects under his own management. <P>SOLUTION: A project management system includes a means for expressing the evaluation result on a project input by a project manager as the evaluation point by marks, analyzing the evaluation result on the project by using the past evaluation point and the evaluation point of a quality guarantee department, sorting the evaluation result of each project taking the analysis result as a key, and displaying the same. <P>COPYRIGHT: (C)2003,JPO |