发明名称 EXECUTION METHOD FOR COLUMN ROW TYPE SOIL IMPROVEMENT BODY
摘要 PROBLEM TO BE SOLVED: To simplify execution of work and shorten a construction period, by proposing an execution method for a new column row-shaped soil improvement body which dispenses with the use of a sheet pile. SOLUTION: Characteristically, a columnar mixture 2, in which a curing agent and soil are mixed and agitated, is formed when the column row-shaped soil improvement body 4 is formed in ground; and a steel pile 3 is erected by being pressed into the columnar mixture 2 before the curing of the columnar mixture 2, and pulled out for removal after completion of cut-and-cover work in the ground which is surrounded by the cured body 4. COPYRIGHT: (C)2003,JPO
申请公布号 JP2003193460(A) 申请公布日期 2003.07.09
申请号 JP20010394372 申请日期 2001.12.26
申请人 MINAMI:KK 发明人 MINAMI KAZUO;MINAMI SEIJI;TAKEUCHI YOSHIRO;MITANI TETSUYA;OKAZAKI TETSUJI
分类号 E02D3/12;E02D5/20;(IPC1-7):E02D3/12 主分类号 E02D3/12
代理机构 代理人
主权项
地址