摘要 |
PROBLEM TO BE SOLVED: To provide a climbing work unit capable of quickly carrying out assembly and disassembly work and, at the same time, quickly carrying out rising and moving work. SOLUTION: The climbing work unit 20 has a unit frame body 21, the unit frame body 21 includes a plurality of vertical struts 22 extended in the vertical direction and a plurality of horizontal bar members 23, and they are arranged to the outside of a building 10. Clamping devices 27 clamped to a skeleton section 11 of the building 10 in a detachable manner are provided to the vertical struts 22, and scaffolding board supporting beams 41 are horizontally projected toward the building 10. Scaffolding boards 47 can be put on the scaffolding board supporting beams 41 in a detachable manner. COPYRIGHT: (C)2003,JPO
|