发明名称 METHOD OF PREPARATION OF BOTTOM OF STEEPLY-DIPPING ORE DEPOSIT BLOCK
摘要 FIELD: mining, particularly, methods of mining of steeply-dipping ore deposits. SUBSTANCE: method is characterized by the fact that extraction block is prepared by trench lateral drift. Drift is driven in barren rock along contact with ore body, with drift width determined by calculation. Broken ore proves to be on drift and removed by loading and transportation machine during its movement from one cross-cut to another. In this case, all are is gathered from floor of trench drift with prevented ore losses. EFFECT: eliminated losses of broken ore on trench drift as compared with its location on ore bed. 2 dwg
申请公布号 RU2206746(C1) 申请公布日期 2003.06.20
申请号 RU20010129858 申请日期 2001.11.05
申请人 T IM. G.V. PLEKHANOVA (TEKHNICHESKIJ UNIVERSITET) 发明人 MINAEV D.JU.;MINAEV JU.L.
分类号 E21C41/22 主分类号 E21C41/22
代理机构 代理人
主权项
地址