摘要 |
<p>PROBLEM TO BE SOLVED: To provide a hose clamp corresponding to increase and decrease in a hydraulic line. SOLUTION: The hydraulic line 4 piped between a body and a boom attachment is bundled by the hose clamp 11. The hose clamp 11 consists of a flexible band-like sheet 12, and holes 13, 13... are drilled at proper intervals in the longitudinal direction. The band-like sheet is curved in the longitudinal direction to surround the hydraulic line 4, and ends 12a and 12a of the band-like sheet 12 are fixed by a bundling wire 14.</p> |