摘要 |
PROBLEM TO BE SOLVED: To provide charnel facilities capable of transferring and extending a cinerary room after the construction, performing the whole transfer, and having a simple and economical structure as a whole. SOLUTION: The charnel facilities comprises a charnel body 4 constructed by vertically and laterally connecting multiple cinerary room receptacles R together, a corridor 5, and a Buddhist statue 6. The cinerary room receptacle R is provided with a room receptacle body, a door member provided in an opening part in its front side, and an inner door member provided in the inside. The cinerary room receptacle R is provided with an engagement projection part and an engagement recess part for the connection in its rear surface side. It is provided with the engagement projection part in its right side surface side and the engagement recess part in its left side surface side.
|