摘要 |
PURPOSE: A construction method of a reinforced concrete slab without form-work on a P.C. beam bridge is provided to reduce the loss of lives and properties by preventing accidents by excluding form-work. CONSTITUTION: The construction method of a reinforced concrete slab without form-work on a P.C. beam bridge comprises the steps of installing P.C.(Precast Concrete) beams on a lower structure of a bridge, such as an abutment(1) and a pier(2) at regular intervals, then executing timbering work and form-work on for placing a reinforced concrete slab(4).
|