摘要 |
PROBLEM TO BE SOLVED: To provide a steel plate form capable of shortening a work process at a job site by using the unitizable steel plate form, a steel plate form unit, and a building wall construction method using the steel plate form unit. SOLUTION: This steel plate form has a buried structure installing steel plate form 36 being a first steel plate form, a piping setting steel plate form 18 being a second steel plate form having a steel plate form plate 16 having a piping hole 15, and a steel plate form fixing member 23 for connecting the first and second steel plate frames. The steel plate form unit 11 is constituted by forming an assembly by using and fixing a steel plate form fixing bolt 24 by combining these members in the prescribed number. Steel plate form units 11a and 11b are arranged on both sides by sandwiching a reinforcement 3, and a building wall is formed by placing concrete between the steel plate form units 11.
|